Skip to content

GitLab

  • Projects
  • Groups
  • Snippets
  • Help
    • Loading...
  • Help
    • Help
    • Support
    • Community forum
    • Submit feedback
    • Contribute to GitLab
  • Sign in / Register
ParaView
ParaView
  • Project overview
    • Project overview
    • Details
    • Activity
    • Releases
  • Repository
    • Repository
    • Files
    • Commits
    • Branches
    • Tags
    • Contributors
    • Graph
    • Compare
  • Issues 1,778
    • Issues 1,778
    • List
    • Boards
    • Labels
    • Service Desk
    • Milestones
  • Merge Requests 66
    • Merge Requests 66
  • CI / CD
    • CI / CD
    • Pipelines
    • Jobs
    • Schedules
  • Operations
    • Operations
    • Incidents
    • Environments
  • Analytics
    • Analytics
    • CI / CD
    • Repository
    • Value Stream
  • Wiki
    • Wiki
  • Snippets
    • Snippets
  • Members
    • Members
  • Activity
  • Graph
  • Create a new issue
  • Jobs
  • Commits
  • Issue Boards
Collapse sidebar
  • ParaView
  • ParaViewParaView
  • Issues
  • #4413

Closed
Open
Opened Feb 04, 2007 by Kitware Robot@kwrobotOwner

Animation Settings Misinterpreted

This issue was created automatically from an original Mantis Issue. Further discussion may take place here.


The fields in the Animation Settings Dialog are either completely misleading or are misinterpreted when generating the movie (probably the latter).

Example 1: saving in sequence mode. I set the Frame Rate to 30 fps and the number of frames to 30. The Animation Duration was automatically set to 1 (which is what I expect). When the animation was saved to individual images, I get 271 frames rather than the requested 30.

Example 2: saving in real time mode. I set the Animation Duration to 1 second and the Frame Rate to 30. The Number of Frames is automatically set to 30, as expected. When the animation was saved to individual images, I get 271 frames rather than the expected 30.

To upload designs, you'll need to enable LFS and have an admin enable hashed storage. More information
Assignee
Assign to
None
Milestone
None
Assign milestone
Time tracking
None
Due date
None
Reference: paraview/paraview#4413