SpreadSheet: not updated correctly for the first timestep
The SpreadSheetView isn't correctly updated for temporal data when we go to the first timestep after another one.
Tested with master and the binary release (5.12.0) of paraview.
To reproduce
- open can.ex2
- open the spreadsheetview
- magnitude for
ACCL[0]
is equal to 0 - move to the next timestep
- magnitude will be equal to
3.21417e+07
- move to the timestep 0
- magnitude is always equal to
3.21417e+07
<----- WRONG - click inside the spreadsheetview
- each value will be correctly updated