An update will be applied January 25th, between 12PM and 1:00PM EST (UTC -5:00). The site may be slow during that time.

  1. 26 Aug, 2009 2 commits
  2. 25 Aug, 2009 3 commits
  3. 24 Aug, 2009 5 commits
  4. 22 Aug, 2009 2 commits
  5. 20 Aug, 2009 4 commits
  6. 19 Aug, 2009 4 commits
  7. 18 Aug, 2009 1 commit
  8. 17 Aug, 2009 3 commits
  9. 15 Aug, 2009 1 commit
    • fogal1's avatar
      resampling: Allow overlaps. · db293d3a
      fogal1 authored
      This will fix some tests, but isn't really what we want.  The
      issue is that we can't composite transparent surfaces correctly,
      since we lose the alphas before compositing.  Therefore we don't
      want transparent surfaces to overlap, and thus producing overlaps
      during resampling is a bad thing.
      
      However there appears to be a secondary bug in the resampler which
      results in gaps unless we allow overlaps.  Thus preventing
      overlaps means solid geometry doesn't look quite right.
      
      Current testing penalizes solid geometry for being wrong, but due
      to other bugs transparent geometry will work out anyway.  Thus I'm
      enabling overlaps for now.
      
      git-svn-id: http://visit.ilight.com/svn/visit/trunk/src@8135 18c085ea-50e0-402c-830e-de6fd14e8384
      db293d3a
  10. 14 Aug, 2009 4 commits
  11. 13 Aug, 2009 2 commits
  12. 12 Aug, 2009 1 commit
  13. 11 Aug, 2009 2 commits
  14. 10 Aug, 2009 6 commits